Manufacturing turns an item on the shared item master into a produced product: a phased bill of materials defines components, planned waste, and cost; a production plan books a facility, assigns an output lot number, and sets phase dates; a guided run then walks each phase from raw material to confirmed output. Every material check reads the same warehouse stock ledger the rest of the platform writes to.

Resolves intoThe production run

The operating model

Production in continON starts from the same item master used by purchasing, warehousing, and sales — a manufactured product is an article with a bill of materials attached, not a separate record in a separate system. Each BOM line names a component article with its required quantity, planned waste, and cost, and lines are grouped into ordered production phases tied to a facility.

A production plan states what to produce, how much, and where: it fixes the quantity, assigns the output lot number, books the facility for the plan window, and lays phase schedules onto start and end dates. Before work begins, the raw material list compares each component’s necessary quantity against what is actually available in the BOM’s warehouse — computed from the stock ledger net of active reservations — so shortfalls surface while there is still time to purchase.

The run itself is a guided sequence per phase: issue raw material, confirm the equipment in use, record waste against the planned figure with justification for the difference, attach documentation, and confirm the produced quantity against a selected warehouse. Phase statuses track progress, and a delay entered on one phase shifts the schedule of every phase after it.

What feeds it

  • Bill of materials
  • Raw stock
  • Resources and machines
  • Phases

Resolves into

The production run

Confirmed output, with waste recorded

  1. Define the recipe

    A phased bill of materials lists each component with required quantity, planned waste, and cost, tied to a facility and a warehouse.

  2. Raise a plan

    The plan fixes product, quantity, and output lot number, books the facility, and sets start and end dates per phase.

  3. Check materials

    The raw material list compares necessary quantity against available stock in the BOM’s warehouse, net of active reservations.

  4. Assign resources

    Employees, assets, and facility equipment are attached to each phase with their own schedule windows.

  5. Run the phases

    The guided run issues raw material, confirms equipment, records waste with justification, and attaches documents phase by phase.

  6. Confirm output

    A confirmation record captures the produced quantity, date, and receiving warehouse for the finished product.

See Manufacturing on your own operations.